Location: Bethlehem, Lehigh and Northampton Counties, PA
Project Time: 2009
Industry: Government
Type of Project: Building Automation
Value of Project: Under $50,000
Installed a control panel to auto-rotate chillers and loop pumps to achieve equal run time; set alarm to ensure chiller or pump auto-start in the case of a failure of the other equipment. Also installed outdoor reset to change chiller water setpoint based on outdoor temperature.
Location: Perkasie, Bucks County, PA
Project Time: 2008
Industry: Worship / Religious Institutional
Type of Project: Retrofit – HVAC
Value of Project: $100,000-249,999
Retrofitted for steam boiler, boiler controls, piping condensing unit and chimney liner.
Location: Quakertown, Bucks County, PA
Project Time: 2003-2004
Industry: Municipal
Type of Project: New Construction – Plumbing & HVAC & Fire Protection
Value of Project: $250,000-499,999
Successfully completed the full range of our mechanical contracting services for both HVAC and plumbing at this branch of Bucks County, PA’s public library system.
Location: Blandon, Berks County, PA
Project Time: 2010-2011
Industry: Retirement & Assisted Living
Type of Project: New Construction – Plumbing
Value of Project: $500,000-749,999
Responsible for all plumbing for $18 million project for senior/assisted living facility with 123-unit, 3-story varied apartment and assisted living units.
Location: Allentown, Lehigh County, PA
Project Time: 2009
Industry: Institutional
Type of Project: Retrofit – HVAC
Value of Project: $500,000-749,999
Replacement of complete heating, ventilating, and air conditioning systems including controls.
Location: Telford, Bucks County, PA
Project Time: 2009-2010
Industry: Municipal / Multi-story Residential
Type of Project: CuraFlo® pipe-lining
Value of Project: $500,000-749,999
Very fast turnaround (10 week schedule) that included several major holidays and major snowstorms for 120-unit six-story senior residence. Epoxy-lined all interior unit domestic hot and cold water and hot/cold/hot-recirculated mains. HUD inspection during project passed without incident.
Location: Bethlehem, Northampton County, PA
Project Time: 2001-2002
Industry: Assisted Living / Multi-story Residential
Type of Project: New Construction – Plumbing & HVAC
Value of Project: $1,000,000-1,499,999
Senior/assisted living facility comprised of three-story apartments with approximately 70 units, and four four-plex cottages.
Location: Harleysville, Montgomery County, PA
Project Time: 2000-2001
Industry: Assisted Living / Multi-story Residential
Type of Project: New Construction – Plumbing & HVAC
Value of Project: $1,000,000-1,499,999
Senior/assisted living facility comprised of three-story apartments with approximately 100 units.
Location: Lansdale, Montgomery County, PA
Project Time: 2000-2001
Industry: Healthcare
Type of Project: Addition – Plumbing & HVAC
Value of Project: $1,000,000-1,499,999
For this 60-bed extended stay nursing facility addition, Integrity Mechanical was asked to take over for a contractor that did not start the project, and we were able to start on the project that same week to help keep on schedule for the general contractor.
Location: Stroudsburg, Monroe County, PA
Project Time: 2007-2008
Industry: Retail/Mixed Use
Type of Project: New Construction – Plumbing & HVAC
Value of Project: $1,000,000-1,499,999
Very fast turnaround (under 8 months) required, including a shell package rough-in and tenant fitout; over 8 national chain stores included.
Location: Birdsboro, Berks County, PA
Project Time: 2004-2006
Industry: Education K-12
Type of Project: New Construction – Geothermal
Value of Project: $2,500,000-2,999,999
Large-range, geothermal project (heats and cools the elementary school utilizing the earth’s internal heat).
Location: Schnecksville, Lehigh County, PA
Project Time: 2003-2006
Industry: Higher Education
Type of Project: Retrofit/Addition – Plumbing
Value of Project: $3,000,000-$3,499,999
Multi-phased complete replacement of existing plumbing system; occupied during construction, requiring close coordination with owner and other contractors.
Location: Gilbertsville, Montgomery County, PA
Project Time: 2004-2006
Industry: Education K-12
Type of Project: Retrofit / Addition – HVAC
Value of Project: $4,000,000-4,499,999
Replacement of HVAC system, pipe and duct; re-tubing boilers, new controls; occupied during construction, requiring close coordination with owner and other contractors.
Location: Bristol and Perkasie, Bucks County, PA
Project Time: 2006-2010
Industry: High Education
Type of Project: New Construction, Retrofit & Addition – Plumbing & HVAC, Solar & Geothermal
Value of Project: $5,000,000-$5,999,999
Combination of three projects: new Phase I and Phase II at Bristol, PA campus, and additions and renovations at Perkasie, PA campus.
Location: West Lawn, Berks County, PA
Project Time: 2008-2010
Industry: Education K-12
Type of Project: New Construction – HVAC, Geothermal
Value of Project: $8,000,000-8,999,999
Worked with 8 prime contractors and finished three months ahead of schedule and without a punch list; Integrity Mechanical retained own engineering firm to evaluate proposed drilling site for geothermal and recommended relocation to save owner significant cost. Geothermal involved 160 wells each 450 feet deep.